2021 Springfield Township Resurfacing Program
-
Before - 2021 Road Photo_1
-
Before - 2021 Road Photo_2
-
Before - 2021 Road Photo_3
-
Before Photo_4
Construction Estimate: $3,372,014.75
Property Assessment per Parcel: $58.55 per year for 10 years
Project Location:
Maria Avenue, Briarrose Court, Toulon Drive, Cloverton Court, Merrymaid Lane, Nohunta Court, Sherman Terrace, Sherwood Drive, West McKelvey, Wildbrook Lane, Terway Lane, Kelso Court, Lakeview Drive, Northfield Lane, Ridgebrook Court, Northbrook Court, Garnoa Drive, Sunwood Court, Crestbrook Drive, Southfield Court, Ferbrook Court, Belsage Court, Newgate Lane, Sarbrook Drive and Woodmill Lane.
This project is an extensive rehabilitation of the above 25 streets. Construction will include the installation of new concrete curb where there is currently existing curb, repairs to storm sewers as well as catch basins, significant full depth repairs to asphalt sub-grade, removal of existing asphalt which will allow for resurfacing with 2.5 inches of new blacktop.
Funding Sources:
- State Capital Improvement Grant = $1,686,007.38
- Township General Fund (JEDZ) = $1,079,044.72
- Township Road Levy = $404,641.77
- Property Assessment = $202,320.89 (after 10 years of collections)
Project Manager: Mike Gould, 513-522-4004, mgould@springfieldtwp.org
Bid Award Date: April 13, 2021
Estimated Construction Start Date: June 1, 2021
Estimated Completed Date: July 1, 2022
Update Notes:
updated 3/25/22
Maria Ave., Briarrose Ct., Toulon Dr., Cloverton Ct., Merrymaid Ln., Nohunta Ct., Sherman Terrace, Sherwood Dr., W. McKelvey, Wildbrook Ln., Terway Ln., Kelso Ct., Lakeview Dr., Northfield Ln., Ridgebrook Ct., Northbrook Ct., Garnoa Dr., Sunwood Ct., Crestbrook Dr., Southfield Ct., Ferbrook Ct., Belsage Ct., Newgate Ln., Sarbrook Dr., & Woodmill Ln.
Maria Ave., Briarrose Ct., Toulon Dr., Cloverton Ct., Merrymaid Ln., Nohunta Ct., Sherman Terrace, Sherwood Dr., W. McKelvey, Wildbrook Ln., Terway Ln., Kelso Ct., Lakeview Dr., Northfield Ln., Ridgebrook Ct., Northbrook Ct., Garnoa Dr., Sunwood Ct., Crestbrook Dr., Southfield Ct., Ferbrook Ct., Belsage Ct., Newgate Ln., Sarbrook Dr., & Woodmill Ln.
Maria Ave., Briarrose Ct., Toulon Dr., Cloverton Ct., Merrymaid Ln., Nohunta Ct., Sherman Terrace, Sherwood Dr., W. McKelvey, Wildbrook Ln., Terway Ln., Kelso Ct., Lakeview Dr., Northfield Ln., Ridgebrook Ct., Northbrook Ct., Garnoa Dr., Sunwood Ct., Crestbrook Dr., Southfield Ct., Ferbrook Ct., Belsage Ct., Newgate Ln., Sarbrook Dr., & Woodmill Ln.
This project is an extensive rehabilitation of these 25 streets. Construction will include the installation of new concrete curb(where there is currently existing curb), repairs to storm sewers as well as catch basins, significant full depth repairs to asphalt sub-grade, removal of existing asphalt which will allow for resurfacing with 2 . inches of new blacktop.